检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹洁[1,2,3,4] 左宇军[1,2,3,4] 李伟[1,2,3,4] 颜林艳[1,2,3,4] 李冰峰
机构地区:[1]贵州大学矿业学院,贵阳550025 [2]贵州大学贵州省非金属矿产资源综合利用重点实验室,贵阳550025 [3]贵州省优势矿产资源高效利用工程实验室,贵阳550025 [4]复杂地质矿山开采安全技术工程中心,贵阳550025
出 处:《工业安全与环保》2016年第11期5-7,49,共4页Industrial Safety and Environmental Protection
基 金:国家"十二五"科技支撑项目课题(2012BAB08B06);贵州省应用基础研究计划重大项目(JZ字[2014]2005);贵州省自然科学研究重点项目(黔教科2010003);贵州大学研究生创新基金(研理工2015068)
摘 要:为探讨充水溶洞中水压对隧道围岩稳定性的影响,利用岩石破坏过程渗流-应力-损伤耦合分析软件F-RFPA^(2D),对隧道底部含充水溶洞的围岩破坏过程进行数值模拟研究,并与岩体中存在裂隙时隧道围岩的破坏过程作对比。结果表明,水压的增加使溶洞与隧道间的岩体逐渐产生裂纹,并不断延伸,最终使隧道与充水溶洞贯通;岩体中裂隙的存在改变了裂纹的扩展方向,加速了隧道底部围岩的破坏进程;实际工程中应将隧道底部围岩垂直方向上的位移变化作为事故发生的前兆,制定相应的预防措施,避免事故的发生。To explore the water pressure effects on the stability of surrounding rocks in water filling cave,software RFPA^(2D) Flow( Two- dimensional Real Failure Process Analysis) is applied to conduct numerical studies on the surrounding rock failure of water filling caves under the bottom of the tunnel and also it is compared with that on surrounding rocks from tunnel of only fracture existed in rock mass. The results show that,with the increase of hydraulic pressure,cracks are gradually produced in the rock mass between cave and tunnel,extended and expanded,which finally leads a transfixion from tunnel to water filling cave,and directions of crack growth can be changed by original fracture exist in rock mass,which accelerates the failure process of the surrounding rock under the bottom of tunnel. In actual engineering,if there will be a significant increase of amount on displacement change in the vertical direction appear in the surrounding rock under the bottom of tunnel,it should be thought of as a sign of disaster,and protective measures also should be taken in case of major accidents.
分 类 号:U452.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222