检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭幼平[1]
出 处:《水力发电》2016年第12期16-19,共4页Water Power
摘 要:水电工程征地移民技术标准是规范建设征地移民安置规划设计技术行为、指导移民安置工作实施、保障水电建设运营的有效手段。研究在回顾水电工程征地移民技术标准编制历程、梳理现行水电工程征地移民技术标准收录情况的基础上,按照水电工程全生命周期的理念,研究建立了水电行业征地移民技术标准体系,分类别、分层级分别在各序列版块提出了技术标准设置思路。The technical standards of land acquisition and resettlement for hydropower projects is an effective means to regularize resettiement design, guide resettlement implementation and ensure hydropower development and operation. In view of the compiling process of resettlement standards for hydropower projects and the collection and analyses of current standards, the standard system of resettlement for hydropower projects is established according to the whole life cycle theory of hydropower engineering, and the ideas for standards setting from category and hierarchical sequence in each section are proposed.
分 类 号:D632.4[政治法律—政治学] TV74[政治法律—中外政治制度]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.74.8