检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国农村水利水电》2016年第12期120-123,共4页China Rural Water and Hydropower
摘 要:为了研究台阶式溢流坝不设反弧段连接时消力池底板脉动压强特性,采用物理模型试验方法,对某水库台阶式溢流坝消力池底板脉动压强特性进行了研究。结果表明,消力池底板脉动压强是随时间变化的平稳随机过程;脉动压强强度和峰值沿程先逐渐增大,在水流冲击区出现最大值,最大值可达1.198 k Pa,随后沿程逐渐减小,且随上游来流量的增加而增大;水跃区脉动压强随台阶高度的降低而增加;消力池底板脉动优势频率为0.01-4 Hz,属低频振动,其概率密度分布为偏态分布。To study the fluctuating pressure in stilling basin floor of stepped spillway with no anti-arc, the fluctuating pressure in stilling basinfloor of stepped spillway is studied by physical model test method.The results show that fluctuating pressure is time-varying stationary randomprocess in the stilling basin floor. Fluctuating pressure intensity and peak value increase gradually along the first, and reach the maximum inflow impacting area, the maximum is 1.198 kPa, then decrease gradually, and increase with an increase in flow traffic. With the decrease instep height, fluctuating pressure increases in hydraulic jump area.The dominant frequency of fluctuations is 0.01- 4 Hz, it belongs to the low-frequency vibration, and the probability density is skewness distribution.
分 类 号:TV641.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198