检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电投集团科学技术研究院有限公司,北京102209 [2]国家电力投资集团公司,北京102209 [3]哈尔滨汽轮机厂有限责任公司,哈尔滨150046
出 处:《汽轮机技术》2016年第6期459-460,共2页Turbine Technology
基 金:"十二五"国家科技支撑计划项目"高效宽负荷超超临界火电机组开发与应用"(项目编号:2015BAA03B00)资助
摘 要:针对1000MW汽轮机两种进汽部分在100%和75%负荷运行时的气动性能对比分析。与传统的喷嘴调节方式相比,全周进汽+补汽调节在额定工况下效率提高了12.9%,75%工况下效率提高了15.3%,且75%负荷时全周进汽结构的效率仅降低0.4%,远小于部分进汽结构的2.8%。分析结果表明,全周进汽+补汽调节更适合宽负荷运行。Aerodynamicperformances of inlet structure have been analyzed between 100% condition and 75% condition for1000MW steam turbine. Compared with traditional inlet structure, efficiency has been improved by 12. 9% at designcondition, 15.3% at 75% load condition. And efficiency of 75% load condition is only less than design condition by0.4%. Otherwise efficiency of partial steam inlet structure is less than design condition by 2.8%. Numerical simulationresults show that full admission with supplement steam regulating are suit for a larger load range.
分 类 号:TK123[动力工程及工程热物理—工程热物理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.201.49