山区大落差管道的试压与吹扫  被引量:5

Pressure Examination and Blow to Sweep of the Big Drop Pipeline of Mountain Area

在线阅读下载全文

作  者:尹辉庆[1] 

机构地区:[1]中国石油天然气管道三公司

出  处:《石油工程建设》2002年第4期27-29,共3页Petroleum Engineering Construction

摘  要:沿山区伴行路、隧道和山梁敷设的管道 ,呈波浪起伏状 ,落差较大 ,由此增大了管道试压与吹扫的难度。文章以兰成渝输油管道第八标段为例 ,介绍了山区大落差管道试压与吹扫的施工经验 :试压与吹扫地段的划分。The pipeline that laid along the companion trip road, tunnel and ridge of mountain area, submits wave to rise and fall, drop is greater, difficulty has increased for pressure examination and blow to sweep. Taking Lanchengyu 8th mark section of petroleum pipeline for example, construction experience of mountain area has been introduced such as partition of section of pressure examination and blow to sweep, location option of water up and down as well as major technical measures.

关 键 词:山区 大落差管道 试压 吹扫 长输管道 油气管道 

分 类 号:TE973[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象