检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕广忠[1] 伍增贵[1] 栾志安[1] 陈江[2] 林万臣[2]
机构地区:[1]石油大学石油工程学院,山东东营257062 [2]吉林油田公司研究院,吉林松原138001
出 处:《石油钻采工艺》2002年第4期39-41,共3页Oil Drilling & Production Technology
基 金:中国石油天然气集团公司"九五"项目 (990 5 0 8- 0 3)
摘 要:数值模拟和油藏工程研究相结合 ,对吉林油田CO2 试验区方案进行优化设计 ,并对最优方案作了长期预报。研究结果表明 ,试验区对CO2 驱有较好的适应性。CO2 合理用量为 15 %HCPV ,最佳注入方式为段塞尺寸逐渐减小的改进交替注气水方式。达到经济极限产量时 ,试验井组内CO2 可波及区采收率提高 15 .Reservoir engineering research and reservoir simulation study were conducted to design and optimize the CO 2 flood project in Jilin oilfield. The result shows that the reasonable total amount of CO 2 is 15%HCPV, and the optimum injection style is suggested as tapering WAG (water alternating gas). When the oil production reaches the economic limit, an additional recovery of 5.2 percent of original oil in place(OOIP) within the well pattern or 15.9 percent in the CO 2 flooded area can be achieved.
关 键 词:吉林油田 方案设计 二氧化碳驱 历史拟合 数值模拟 交替注气水 气窜
分 类 号:TE357.45[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195