检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]沈阳建筑大学土木工程学院,辽宁沈阳110168
出 处:《沈阳建筑大学学报(自然科学版)》2016年第6期1026-1032,共7页Journal of Shenyang Jianzhu University:Natural Science
基 金:国家十二五科技支撑计划项目(2011BAJ10B04);沈阳市建委基金项目(sjw2015-06)
摘 要:目的对比现有两种装配式剪力墙结构拆分方式,提出一种新的拆分方式,结合工程案例验证该方式的可行性.方法参照柱梁体系拆分方法,在此基础上改进现有装配式剪力墙结构拆分方式,在满足等同现浇要求的前提下,保证施工质量.结果新的拆分方式外墙几乎全预制,现浇部分设置在内墙,内墙可以选择部分预制或者全部现浇,梁与填充墙拆开,剪力墙与连梁拆开,现场操作简单,外墙湿作业明显减少,现浇部分模板基本为一字型,预制构件全部为一字型,构件制作简单,传力途径清晰,使连接构造与计算假定相符合.结论笔者提出的拆分方式解决了现有两种拆分方式存在的问题,可为装配式剪力墙结构拆分设计提供借鉴.Compared with the existing two split types of prefabricated shear wall structure, the pa- per proposed a new split approach and combined with engineering examples to validate the feasi- bility of this method. According to the method of splitting the column-beam system, the existing splitting structure of the assembled shear wall structure is improved and the construction quality is guaranteed under the premise of satisfying the equivalent cast-in-situ requirement. The new mode of split wall almost entirely prefabricated and cast-in-situ set in the interior wall. The interior wall can choose part of the prefabricated or all cast-in-situ. The beam and the filling wall can be taken apart. The shear wall and beam can be separated. On-site operation is simple, so the wetting opera- tion of the exterior wall is obviously reduced. The cast-in-situ part of the template is basically a font and the prefabricated parts are all of a type. The components are simple and the force trans- mission way is clear. In conclusion, the connection structure and calculation assumption are in good agreement. The split method was proposed to solve the problems in the two existing split methods and provide reference for the split design of prefabricated shear wall structure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.149.120