检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵丹[1]
出 处:《石油化工设计》2016年第4期42-45,共4页Petrochemical Design
摘 要:随着进口原油量的增加,国内沿海地区需要建设大批量储罐(建筑在软土地基上);软土地基不经处理,不能满足储罐对基础承载力及沉降和不均匀沉降的设计要求。为提高软土地基的承载力,减少地基的沉降和不均匀沉降,将充水预压与充水试压相结合用于储罐地基处理,是一种经济高效的地基处理方法。A large number of tanks shall be built in China as the petroleum importation increases in recent years.Usually,tank foundations are built on soft subgrade with high compressibility and low bearing capacity.Prior to ground improvement,this soft subgrade cannot meet the design requirements of tank for soil bearing capacity,settlement and differential settlement.Therefore,different measures are taken to increase the soil bearing capacity and decrease both the settlement and the differential settlement.This paper introduces the application of ring-wall tank foundation and water-filling preloaded foundation in soft soil improvement.
分 类 号:TU753[建筑科学—建筑技术科学] TE972[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43