检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]College of Water Conservancy and Hydropower Engineering,Hohai University
出 处:《Journal of Hydrodynamics》2016年第5期914-917,共4页水动力学研究与进展B辑(英文版)
基 金:Project supported by the National Natural Science Foun-dation of China(Grant No.51479057);the PAPD(Grant No.3014-SYS1401)
摘 要:A new kind of ski-jump-step spillway was reported. By means of the effects of the aeration basin, it supplies the sufficient aeration flow from the first step for stepped chutes, especially for large unit discharge. The physical model experiments demonstrated that, this spillway makes a far better hydraulic performance as regards energy dissipation and cavitation damage protection than the current and conventional stepped spillways, and the unit discharge can be enlarged from about 50 m3/s-60 m3/s.m to 118 m3/s.m in order to significantly reduce the width of the spillways.A new kind of ski-jump-step spillway was reported. By means of the effects of the aeration basin, it supplies the sufficient aeration flow from the first step for stepped chutes, especially for large unit discharge. The physical model experiments demonstrated that, this spillway makes a far better hydraulic performance as regards energy dissipation and cavitation damage protection than the current and conventional stepped spillways, and the unit discharge can be enlarged from about 50 m3/s-60 m3/s.m to 118 m3/s.m in order to significantly reduce the width of the spillways.
关 键 词:CAVITATION energy dissipation PRE-AERATION ski-jump-step spillway
分 类 号:TV651.1[水利工程—水利水电工程] TV652.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.71