大型采场底部结构布置形式研究  被引量:4

Study on the Arrangement Form of Bottom Structure in Large Stope

在线阅读下载全文

作  者:李伟明[1,2,3] 

机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]国家金属采矿工程技术研究中心,湖南长沙410012 [3]金属矿山安全技术国家重点实验室,湖南长沙410012

出  处:《矿业研究与开发》2016年第12期5-7,共3页Mining Research and Development

摘  要:为研究大型采场合理底部结构的布置形式,通过对比分析确定采用堑沟式底部结构作为大型采场的最佳形式,同时根据技术经济分析,确定了长进路双采场底部结构为马坑铁矿大型采场的最优的堑沟型底部结构形式。实践应用表明,较传统的底部结构布置形式,长进路双采场底部结构节省了10%的总采切工程量,多回收了20%~30%的崩落矿量,具有较好的经济效益。To study the arrangement form of reasonable bottom structure, the bottom of the trench structure was determined to be the optimal form in large-scale stope by comparative analysis. At the same time, from technical and eco- nomic comparison, the trench bottom structure with long route and double stope was selected as the best for Makeng Iron Mine. Practical application showed that compared with the traditional arrangement of bottom structure, the new bottom structure saved 10% of the total mining and cutting engineering quantities, and increased 20%~30% of the ore recovery, which achieved good economic benefits.

关 键 词:大型采场 底部结构 压矿量 出矿率 

分 类 号:TD853.362[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象