作 者:邱枫
机构地区:[1]辽宁五龙黄金矿业有限责任公司,辽宁丹东118000
出 处:《矿业工程》2016年第6期1-2,共2页Mining Engineering
摘 要:对甲乙两个赤铁矿选矿厂项目的初步设计概算做静态投资分析比较,乙项目的单位原矿投资为甲项目的两倍,分析其原因是甲项目单位处理量投资比乙项目高,除不可避免的价格因素,建议业主加强施工管理和招标采购工作来降低工程造价。The paper conducts static investment analysis comparison for the preliminary design budget estimation of two hematite beneficiation plants A and B. the raw ore investment per unit of Project B is twice as much as that of Project A. The analysis on its reasons is that the investment of unit handling capacity of Project A is higher than that of Project B. Except the unavailable price factors, it suggests the Owner strengthening construction management and tendering and procurement works to reduce project costs.