检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘钰
机构地区:[1]中国电建集团中南勘测设计研究院有限公司宜昌设计院,湖北宜昌443000
出 处:《水电与新能源》2016年第12期27-31,共5页Hydropower and New Energy
摘 要:介绍金平水电站放水管水垫塘消能的结构形式、水垫塘消能机理,通过水力学计算优化了放水管出流口的角度和水垫塘的结构尺寸。工程运行结果表明:放空管水垫塘较好地解决了高速水流的消能问题,相关水力学模型试验成果可给后期研究提供参考。In Jinping Hydropower Station,the water cushion pool type energy dissipation scheme is adopted for the emptying tunnel. The structure and the energy dissipation mechanism of the water cushion pool are introduced. Then,the angle of the emptying tunnel outlet and the structural dimensions of the water cushion pool are optimized using hydraulic calculations. Practical operation shows that the high speed discharging water flow energy dissipation performance of the water cushion pool is satisfactory. Also,the hydraulic model test results could be useful references for the following studies.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.56.198