金平水电站放空管水垫塘消能设计  被引量:1

Energy Dissipation Scheme Design for the Water Cushion Pool behind the Emptying Tunnel in Jinping Hydropower Station

在线阅读下载全文

作  者:刘钰 

机构地区:[1]中国电建集团中南勘测设计研究院有限公司宜昌设计院,湖北宜昌443000

出  处:《水电与新能源》2016年第12期27-31,共5页Hydropower and New Energy

摘  要:介绍金平水电站放水管水垫塘消能的结构形式、水垫塘消能机理,通过水力学计算优化了放水管出流口的角度和水垫塘的结构尺寸。工程运行结果表明:放空管水垫塘较好地解决了高速水流的消能问题,相关水力学模型试验成果可给后期研究提供参考。In Jinping Hydropower Station,the water cushion pool type energy dissipation scheme is adopted for the emptying tunnel. The structure and the energy dissipation mechanism of the water cushion pool are introduced. Then,the angle of the emptying tunnel outlet and the structural dimensions of the water cushion pool are optimized using hydraulic calculations. Practical operation shows that the high speed discharging water flow energy dissipation performance of the water cushion pool is satisfactory. Also,the hydraulic model test results could be useful references for the following studies.

关 键 词:水垫塘 消能机理 水力学计算 结构尺寸 

分 类 号:TV653[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象