检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛云花 翟彦寿 韩兴国[2] XUE Yunhua ZHAI Yanshou HAN Xingguo(CEEC Shanxi Electric Power Engineering Co., Ltd., Taiyuan 030001, Shanxi, China Taiyuan Iron & Steel (Group) Co., Ltd., Taiyuan 030003, Shanxi, China)
机构地区:[1]中国能源建设集团山西省电力勘测设计院有限公司,山西太原030001 [2]太原钢铁(集团)有限公司,山西太原030003
出 处:《能源与节能》2016年第12期122-124,共3页Energy and Energy Conservation
基 金:山西省重点研发计划项目(201603D321021)
摘 要:介绍了太钢自备电厂锅炉补给水处理系统的设计选型、主要设备的配置,尤其对"全膜法"运行多年后的状况进行了详细描述。实践表明,整套系统出水质量高、运行操作方便经济,在适宜的水质下,可作为大型电站水处理系统的首选。This paper introduced the design selection and the configuration of the main equipment of boiler make-up water treatment system of TISCO-owned power plant, especially the situation after many years of IMT operation. Practice shows that the whole system can achieve high water quality and its operation is easy and IMT will be the first choice of power plant water treatment system in the appropriate water quality.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.48.163