检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王斌[1] 叶会华[1] 王泽生[1] 由玉文[1] 李伟 高滨 Wang Bin Ye Huihua Wang Zesheng You Yuwen Li Wei Gao Bin(School of Energy and Safety Engineering, Tianjin Chengjian University, Tianjin 300384, China Shangdong Huake City Planning and Architectural Design Co., Ltd., Liaocheng 252000, China)
机构地区:[1]天津城建大学能源与安全工程学院,天津300384 [2]山东华科规划建筑设计有限公司,聊城252000
出 处:《太阳能学报》2016年第12期3195-3198,共4页Acta Energiae Solaris Sinica
基 金:天津市科技支撑计划(10ZCGYGX02000)
摘 要:通过组建的离网风电-网电互补抽油机供电模拟试验装置,对供电系统及其测控系统性能进行试验研究。结果表明:该试验系统能准确模拟风力机发电的实际运行情况和抽油机的载荷变化,风电-网电双电源的切换过程中对供电效果无明显影响。The simulation test device of off-grid wind power-grid power complementa y system was set up to supply electricity for oil-pumping unit, and the supply power system and the performance of its measurement and control system were studied. The test results show that the test system can accurately simulate the practical operation of wind turbine generator and load change in the oil-pumping unit, the impact of the switch process of double powers on the power supply is not obvious.
关 键 词:离网风力发电 互补供电 充放电切换 风电一网电切换
分 类 号:TK89[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200