作 者:王健[1] Wang Jian(Shanghai Municipal Engineering Design Institute Co. , Ltd. , Shanghai 200092, Chin)
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092
出 处:《给水排水》2017年第1期33-36,共4页Water & Wastewater Engineering
摘 要:提高自来水厂出水水质是近年来国内各大现状水厂的主要任务之一。由于大多数水厂受到征地有限和无法停产改造等限制,因此需要边改造边生产,且利用现有场地条件进行深度处理改造工程建设。水厂通过中试确定了合理的工艺,分期分步骤改造确保了水厂的基本生产运行不受影响,在十分紧张的场地内改造了常规净水工艺,增设了深度处理和污泥处理工艺,预留紫外线消毒的处理流程,有效地提高了水厂的出厂水水质,较经济地实现了工程的目标。Improving drinking water quality is one of the major objects of many drinking water plants recently. The upgrading of the treatment process for advanced purification is often undertaken while the water plants are still in service and the reconstruction of the water plants must be implemented un- der the existing site conditions, because most water plants are limited with land acquisition and can- not stop production during the upgrading. In this retrofit design, a suitable treatment process was determined via pilot tests. The upgrading and reconstruction are divided deliberately into two sta- ges to ensure that the normal operation of the plant is not affected. Under restricted land availabili- ty condition, the conventional treatment process is upgraded to include advanced treatment proces-ses and a sludge treatment unit, with reserved space for UV disinfection. This design effectively improves the water quality of the plant and achieves the project's goals economically.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43