乌鞘岭隧道整体道床病害原因分析及处理  被引量:5

The Cause and Treatment of Monolithic Track Damages of Wushaoling Tunnel

在线阅读下载全文

作  者:薛再兰[1] XUE Zai-lan(China Railway First Survey & Design Institute Group Co. , Ltd. , Xi'an 710043, China)

机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043

出  处:《铁道标准设计》2017年第1期85-89,共5页Railway Standard Design

摘  要:为了彻底整治乌鞘岭隧道整体道床病害,借助雷达监测、钻孔取芯等辅助措施对病害产生的原因进行分析,并借鉴国内部分隧道采用压注聚氨酯材料抬升整体道床的成功经验对病害进行整治,取得成功。实践证明,聚氨酯注浆抬升整体道床是处理隧道道床沉降的一种简洁高效方法。In order to thoroughly renovate the damages of monolithic tracks in Wushaoling Tunnel,the causes of track damages are analyzedby means of radar detection and core drilling,and corresponding grouting treatments with polyurethane material are successfully implemented based on the well established methods for other domestic tunnels.Practices prove that the treatment with polyurethane grouting is a simple and effective way to treat tunnel track settlement.

关 键 词:铁路隧道 特长隧道 整体道床 病害 聚氨酯 抬升 

分 类 号:U457.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象