机构地区:[1]福建福清核电有限公司,福建福清350300 [2]上海电力股份上电工程公司,上海200090
出 处:《中国核电》2016年第4期344-349,共6页China Nuclear Power
摘 要:本文针对核电厂调试试验期间,发生主给水泵意外"跳泵"引发反应堆停堆的根本原因进行技术分析,结合国内同行经验给出了有效的改进措施,从设备本体装配尺寸改进、系统设计回路优化两个方面,对如何提高主给水泵运行安全和可靠性进行深入阐述和分析。经过相关试验运行验证,优化改进措施和方案可以提高设备运行可运行性,尤其是保证主给水泵在负荷变化瞬态时的可运行性。并为其他核电厂同类型主给水泵运行调试,提供了一定的工程参考。During commissioning, the main feed pump was "turn off" , the root cause was analyzed, and effective improvement actions were taken according to renting experience. Improving the safety and reliability from equipment assembly size control and system design were also deeply explained and analyzed. All modifications have been verified through relevant test. These modifications can ensure the pump operating safety even during load changing transient. While improving the opemtionability of equipment, relating actions and modifications could make reference to other plants.
分 类 号:TL36[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229