检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱斌[1,2,3] 赵宝生[1,2,3] 刘有军[1,2,3] 王纪伟[1,3] 董桂红[1,3] 胡韶懿 Qiu Bin Zhao Baosheng Liu Youjun Wang Jiwei Dong Guihong Hu Shaoyi(Yunnan Key Laboratory of Building Structure and New materials (in preparation), Kunming 650223, China Kunming Key Laboratory of Building Structural Safety and New Technology, Kunming 650223, China Yunnan Institute Of Building Research, Kunming 650223, China)
机构地区:[1]云南省建筑结构与新材料企业重点实验室(筹备),昆明650223 [2]昆明市建筑工程结构安全和新技术重点实验室,昆明650223 [3]云南省建筑科学研究院,昆明650223
出 处:《建筑结构》2017年第1期50-54,共5页Building Structure
基 金:云南省科技厅院所专项项目(2013DC010);昆明市建筑工程结构安全和新技术重点实验室资助项目;昆明市建筑材料研发与检测科技创新团队发展计划资助项目
摘 要:通过对云南省2014年"10.07景谷地震"震后建筑结构安全性检测及抗震性能鉴定结果的归纳总结,得出如下结论:应准确分析框架结构梁柱节点与柱脚的损伤情况、填充墙的分布和梁柱施工缝留置位置及其处理方式对结构安全性及抗震性能的影响;应正确评价单跨框架、纵向框架梁按照连系梁设计的框架结构的安全性;应重视对填充墙门窗洞口处圈过梁、构造柱设置等抗震措施的检测,并充分考虑其对结构安全性的影响;砌体结构教学楼应重视抗震概念对结构安全性及其抗震承载性能的影响;若检测时室外回填尚未完成或未达设计要求,应在鉴定时充分考虑该因素对结构安全性的影响,并应及时建议按设计要求完成回填。Structure safety inspection and seismic performance appraisal results of post-earthquake buildings after " 10. 07 Jinggu earthquake" in Yunnan province in 2014 were summarized, the following conclusions were obtained. The damage conditions of beam-column joint and the column foot of frame structure, the distribution of the filler wall and indwelling position and treatment of beam-column construction joint should be accurately analyzed as well as their influences on the structure safety and the seismic performance. The frame structure safety should be correctly evaluated with single span frame and longitudinal frame beam designed according to coupling beam requirements. Attention should be paid to the inspection of seismic measures for ring beams and constructional columns at windows and doors of filler wall, and its influence on the structure safety should be fully considered. Masonry structure teaching buildings should attach importance to the effects of seismic concept on the structure safety and seismic bearing performance. If the outdoor backfill has not been completed or failed to reach the design requirements in testing, the factor's influence on structure safety should be fully considered, and it's suggested to complete the backfill without delay according to the design requirements.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112