MB670/193型掘锚机在王家岭煤矿巷道施工中的应用  

MB670/193 Mode Bolterminer Applied to Construction of Mine Gateway in Wangjialing Mine

在线阅读下载全文

作  者:王明武 邵泽渠 

机构地区:[1]中煤第五建设有限公司第一工程处,江苏徐州221006

出  处:《建井技术》2016年第5期42-45,共4页Mine Construction Technology

摘  要:王家岭煤矿18103工作面胶带运输巷设计长度2 112m,采用MB670/193型掘锚机,沿4号煤层底板掘进,一次成巷,后配套1部DSJ-80型带式输送机转载出煤。巷道于2015-04-01开工,到2015-07-30施工结束,月进尺平均为520m左右,实现了安全、优质、快速、高效施工。实践表明,煤巷采用掘锚机掘进,可取得良好的技术经济效益。A designed length of a belt conveyor gateway in No. 18103 coal mining face of Wangjialing Mine was 2 112 m. The mine gateway was completed along the floor of No. 4 seam with a MB670/193 mode bolterminer and once driving and a DSJ-80 belt conveyor was applied at the rear of the bolter- miner to the stage loading of the coal. The construction of the mine gateway was started at April 1, 2015 and was completed at July 30,2015. The month average driving rate of the gateway was about 520 m and a safety, quality, rapid and high efficient construction of the gateway was realized. The prac- tices showed that the bolterminer applied to the driving of the gateway could have good technical and economic benefits.

关 键 词:掘锚机 煤矿巷道 施工 一次成巷 机械化作业线 

分 类 号:TD263.32[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象