检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋孝春 张亚立 劳逸民 韦航 刘燕军 关文吉 黄学勤 李文伟 尤晶 谢栋辉
机构地区:[1]中国建筑设计院有限公司 [2]北京天银地热开发责任有限公司
出 处:《暖通空调》2017年第1期74-79,54,共7页Heating Ventilating & Air Conditioning
摘 要:北京奥运村项目再生水热泵采用清河污水处理厂处理的污水作为水源,通过在清河岸边的取水、退水、换热和换热水输送系统及在奥运村内的冷热水制备和输送系统,为奥运村赛时、赛后的空调系统提供冷热源。介绍了该项目的冷热源系统设计,包括取水、退水、换热系统,中心机房,冷热水输送系统及室内末端计量、控制系统。The reuse water-source heat pump of the project adopts the treated sewage of Qinghe sewage treatment plant as water source, through the water intake and return, heat transfer and transportation system in the Qinghe shore and the chilled and hot water preparation and delivery system in Olympic Village, to provide the cold and heat source for air conditioning system during the match and after the game. Presents the design of the cold and heat source system, including the water intake and return system, heat exchange system, central plant, chilled and hot water delivery system, and indoor terminal measurement and control system.
关 键 词:奥运村 再生水热泵 系统设计 三级泵系统 冷热源
分 类 号:TU83[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175