检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:聂如松[1,2] 冷伍明[1,3] 魏丽敏[1] 徐方[1] NIE Rusong LENG Wuming WEI Liming XU Fang(School of Civil Engineering, Central South University, Changsha, Hunan 410075, China National Engineering Laboratory for High Speed Railway Construction, Changsha, Hunan 410075, China Key Laboratory of Heavy-Hual Railway Engineering Structure, Ministry of Education, Changsha, Hunan 410075, China)
机构地区:[1]中南大学土木工程学院,湖南长沙410075 [2]重载铁路工程结构教育部重点实验室,湖南长沙410075 [3]高速铁路建造技术国家工程实验室,湖南长沙410075
出 处:《水文地质工程地质》2017年第1期64-70,共7页Hydrogeology & Engineering Geology
基 金:国家自然科学基金资助项目(51108464)
摘 要:软土地基对外部环境的变化非常敏感,附近堆载对高速铁路既有桥墩基础可能产生重大影响,必须加以控制。以某高速铁路典型桥墩为例,建立三维有限元模型,分析了实际情况下堆载对桥墩变位的影响,其结果与实测数据吻合良好;然后变化堆载与桥墩之间的距离,详细地分析了不同距离下堆载对桥墩群桩基础的内力和变位的影响。结果表明:堆载与既有桥墩的距离越远,堆载对桥墩桩基础的内力和变位的影响越小。当堆载距离d小于软土层厚度h的4倍时,随d/h的增加,桥墩水平变位下降迅速;当d/h>4时,随d/h的增加,桥墩水平变位下降缓慢。堆载与桥墩之间的控制距离取决于堆载规模、软土厚度和埋深、桥梁上部结构正常工作条件下所能容许的最大水平变位。The distance between surcharge load and existing bridged pile foundation is an important factor affecting the internal forces and displacements in piles. 3-D finite element models are set up to implore the behaviors of a pile foundation in a bridge of a high-speed railway line in China due to surcharge load. The calculated results are in good agreement with the field results. The distances between surcharge load and existing bridged pile foundation are varied to study the internal forces and horizontal displacements in piles. The results indicate that the larger the distance is, the smaller the internal forces and horizontal displacements in piles are. When the distance d is less than 4 times the depth of soft clay h, the horizontal displacements of pile groups decrease linearly quickly with an increase in d/h; while d is larger than 4 times h, the horizontal displacements of pile groups decrease slowly with an increase in d/h. The suitable distance between surcharge load and existing pile foundation is determined with the maximum permissible displacement of the upper structures under normal operating conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117