综放工作面初采初放期间冲击地压防治研究  

Study on the control of rock burst during the initial mining and initial discharge of fully mechanized top coal caving face

在线阅读下载全文

作  者:齐建峰 

机构地区:[1]河南大有能源股份有限公司常村煤矿,河南义马472300

出  处:《山东煤炭科技》2017年第1期102-103,106,109,共4页Shandong Coal Science and Technology

摘  要:常村煤矿21220综放工作面初采、初放期间,加强支架工作阻力、应力及微震的监测、分析,加强工作面冲击危险性预警,在发生冲击大能量破坏事件的概率增加时,及时下发预警通知单,工作面停止生产作业,采取施工卸压钻孔、断底爆破、煤层注水等防治措施解除冲击威胁,在初采、初放期间未因冲击造成设备损坏及人员轻伤等事故的发生,确保了21220综放工作面的安全生产。At the initial mining period and the primary caving period of Changcun Coal Mine 21220 fully mechanized caving face, by strengthened the support working resistance and press, and the microseism monitoring, strengthened the work of the rock burst hazard warning, when the probability of occurrence of large energy damage events that result rock burst increases, promptly issued a warning notice, at the stopping production, by constructed the pressure relief borehole, blasted to cut off the bottom, coal seam water injection to control the impact threat ,and ensure that the 21220 fully mechanized working face safety production.

关 键 词:冲击地压 支架折损 技术管理安全生产 

分 类 号:TD324[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象