长距离置换式灌浆法处理大坝横缝止水渗漏  被引量:3

Application of long-distance replacement grouting method in seepage treatment of waterstop at dam transverse joints

在线阅读下载全文

作  者:陈磊 吴启民[2] 

机构地区:[1]长江勘测规划设计研究院,湖北武汉430010 [2]杭州国电大坝安全工程有限公司,浙江杭州310030

出  处:《大坝与安全》2016年第5期67-69,共3页Dam & Safety

摘  要:针对大坝运行期水下横缝止水渗漏处理问题,研究提出了利用置换式灌浆法对止水检查槽进行封堵的处理方法,并系统地介绍了该方法的工作原理、施工条件和工艺过程,以及在三峡大坝中的实际应用情况,对这一方法的特点和适用范围进行了说明,为大坝横缝止水渗漏问题的解决提供了新的途径和手段。We have studied the leakage problem of underwater transverse joints in dam operation period, and then put forward the replacement grouting method to plug sealing check slots. This paper introduces the principle, construction condition and application process of the method. Moreover, this paper also describes the characteristics and application scope of this method, as well as its application in the Three Gorges dam, which proves that the method is effective for solving the seepage problem of dam transverse joints.

关 键 词:置换式灌浆 止水系统 渗漏 处理 

分 类 号:TV543[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象