基于YJK软件的某超高层核心筒桩筏基础的计算分析  

Numerical Analysis of Piled Raft Foundations of a Very High Raised Building

在线阅读下载全文

作  者:陈平 

机构地区:[1]广州瀚华建筑设计有限公司,广州510655

出  处:《土工基础》2016年第6期637-640,共4页Soil Engineering and Foundation

摘  要:利用盈建科软件计算某超高层核心筒桩筏基础,对比分析了三种计算模型,分别是不考虑上部结构刚度计算模型、考虑上部结构刚度计算模型及变刚度调平法计算模型。结果表明:考虑上部结构刚度与桩筏基础的变形协调,能有效降低筏板的配筋量;在保证桩的承载力能够满足上部荷载的情况下,可以通过变刚度调平法,调节筏板的变形,能够减少筏板的配筋量,避免不必要的浪费。The piled raft foundation of the structural core cylinder of a very high raised building is numerically analyzed from three different model approaches by using a commercial software YJK.These three models are:computational model that not considering the stiffness of the superstructure;computational model that considering the stiffness of the superstructure and the computational mode with variable adjusted stiffness.The results indicate that,the model that considers the stiffness of the superstructure and the compatibility of the foundation can effectively the steel reinforcement in the piled raft foundations.With the enough pile axial capacity,the deformation of the piled raft foundation can be controlled through the adjustment of the superstructure stiffness.

关 键 词:桩筏基础 上部结构刚度 变刚度调平法 

分 类 号:TU471[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象