检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李乐[1,2] 邱晓慧[1] 卢拥军[1] 吕开河[2] 崔伟香[1]
机构地区:[1]中石油勘探开发研究院廊坊分院,河北廊坊065007 [2]中国石油大学(华东)石油工程学院,山东青岛266580
出 处:《化学工程师》2017年第1期66-70,78,共6页Chemical Engineer
基 金:国家863计划"致密砂岩气藏低伤害压裂液体系研究与应用"(No.2013AA064801);国家课题:储层改造压裂液关键技术研发(No.2016ZX05023003)
摘 要:中石油廊坊分院为改善压裂作业中油藏的油水界面性能,研发了新型驱油剂DL-15。本文对DL-15展开了性能评价和驱油机理探究并介绍其应用。实验表明:0.2%浓度的DL-15在20℃下能使长庆原油界面张力降低至:0.061m N·m^(-1),提高温度或者加入低浓度盐均能进一步改善其界面性能,使之达到10-3m N·m^(-1),耐盐性实验和驱替实验均表明在高矿化度条件下,DL-15依然可以保持较好的界面活性。填砂管实验和岩心驱替实验表明0.5%DL-15相对水洗油,水驱油采收率分别提升10.6%和9.04%。分析DL-15提高采收率的机理,主要是良好的渗透性能、适当的亲水性、低的界面张力共同作用。根据长庆油田现场应用瓜胶—DL-15体系压注采一体化作业动态生产数据,驱油剂DL-15提高采收率性能优越,对比压注采作业前,日产油量提升70%以上。In order to improve the interfacial properties of reservoir water in fracturing operations, Fracturing Services Institute Petro-China R1PED-Langfang developed a new type of oil displacement agent-DL-15. This paper is related to DL-15's performances evaluation, D-15's oil displacement mechanism exploration and DL-15's appli- cation introduction. A series of experiments show that 0.2%DL-15 at 20℃ can reduce the Changqing crude oil in- terfacial tension to 0.061 mN ·m-L. And the interfacial tension could even reduce to 10-3mN ·m-1 by increasing the temperature or adding a low concentration of salt. Salt tolerance experiments and displacement experiments both show that DL-15 can still maintain a good interfacial activity in high salinity brine. Sand pack flood tests and core displacement tests show the oil recovery by 0.5%DL-15 is 10.6% higher than washing oil out sand and 9.04% high- er than water flooding recovery. The analysis of the DL-15 oil displacement mechanism mainly includes the pene- tration properties, the appropriate hydrophilicity and the low interfacial tension interaction. According the data from Changqing Oilfield application Guar Gum-DL-15 fracture-fill-extraction integrated operation dynamic production, DL-15 enhanced oil recovery performance is superior. And it can help more than 70% daily oil production before the previous injection-production pressure job.
分 类 号:TE357.46[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.151