检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]辽宁工程技术大学力学与工程学院 [2]冀中能源集团有限责任公司,河北邢台054000
出 处:《中国安全科学学报》2016年第12期86-91,共6页China Safety Science Journal
基 金:国家自然科学基金资助(50974070;51474120)
摘 要:为探究提高尾矿库稳定性措施的有效性,以阜新阿哈来铁尾矿库为例开展物理模拟研究,分别对比初期坝为土石坝和透水坝时尾矿库浸润线的变化,加设筋带与未加设筋带坝体的失稳过程差异。结果表明,各种库水位条件下,透水初期坝使尾矿库浸润线显著降低,尾矿库失稳时,首先在底部坡面出现裂纹并向内部和上部发展,之后在初始裂纹上部依次产生裂纹并扩展,直至整体失稳,加设筋带时裂纹发展间距小,滑裂带位置浅,失稳过程缓慢,滑裂带尾矿滑经筋带时速度减慢并滚动,滑坡体的整体动能显著减小。For the sake of researching effectiveness of the measures to improve the tailings pond stability, taking Fuxin Ahalai iron tailings pond as an example, physical simulation experiments were carried out. Change in saturation line was observed for an earth-rock dam and a permeable dam both as a starter dam. Difference in instability process was examined between two dams one of which was reinforced. The results show that: for all water levels, the permeable starter dam makes the saturation line obviously decrease, when the tailings pond is losing instability, first crack appears at the bottom of slope surface and develops to internal and upper of dam body, then on the top of the initial crack produces crack successively and expand, until the whole instability, when the reinforcement strip is setted, crack development spacing becomes small, the position of slip crack belt shallow, instability process slow and that tailings in slip crack belts slides through reinforcement strip and the speed is slower, the overall kinetic energy of the landslide is significantly decreased.
关 键 词:尾矿库 物理模拟 透水初期坝 浸润线 筋带 滑裂带
分 类 号:X936[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117