汽车涂装电泳线分期投资方案  

Investment project by stages for electrophoresis line of automotive painting

在线阅读下载全文

作  者:郭志强[1] 孙琢[1] 郭定邦[1] 沈彦亭[1] 张磊[1] 张大彪[1] GUO Zhi-qiang SUN Zhuo GUO Ding-bang SHEN Yah-ring ZHANG Lei ZHANG Da-biao(Technology Center of Great Wall Motor Co., Ltd., Baoding 071000, China)

机构地区:[1]长城汽车股份有限公司技术中心,河北保定071000

出  处:《电镀与涂饰》2017年第2期94-100,共7页Electroplating & Finishing

摘  要:为避免产能与预计销量不匹配造成投资和能源浪费,以设计产能15万台/年的涂装生产线为例,详细介绍了如何对电泳线进行分期建设:一期产能7.5万台/年,二期通过适当的改造即可达到设计产能。Aiming to avoid the waste of investment and energy and estimated sales volume, how to build an electrophoresis line by for 150 thousand cars per year as an example: 75 thousand cars per stage after proper reconstruction. caused by incompatibility between production capacity stages was introduced taking the production line designed year at the first stage and designed capacity at the second

关 键 词:汽车 涂装 电泳线 分期投资 设备 改造 

分 类 号:TQ630.8[化学工程—精细化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象