检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵春洋
机构地区:[1]沈阳远大铝业工程有限公司,辽宁沈阳110027
出 处:《中国建筑防水》2017年第3期7-10,共4页China Building Waterproofing
摘 要:济南奥体中心体育馆金属屋面采用直立锁边固定方式,屋面没有螺钉外露,从根本上杜绝了传统螺钉穿透固定方式带来的漏水隐患;屋面本身自成排水路线,直立锁边屋面板肋直立,排水断面几乎不受板肋影响;板肋高达65 mm,保证了屋面板在坡度平缓情况下的防水性能。Standing seam interlock is adopted for the stadium metal roof of Jinan Olympic Sports Center, and there is no exposed bolts. This completely eradicates the leakage danger of traditional fastening method by penetrated bolts. The roof itself forms water draining route, and water drainage section hardly affected by the plate ribs, since the ribs of standing seam roof plate are vertical. The height of plate rib is up to 65 mm, which guarantees the waterproofing performance at gentle slope.
分 类 号:TU231[建筑科学—建筑设计及理论] TU761.11
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28