检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安建筑科技大学土木工程学院,陕西西安710055 [2]西安天正房地产价格评估咨询公司,陕西西安710055
出 处:《施工技术》2017年第3期93-97,共5页Construction Technology
摘 要:对某框架剪力墙结构施工过程中的支撑立杆轴力和楼板相对位移进行现场实测,得到了多层模板支撑体系在施工过程中立杆的内力时程曲线和楼板的挠度曲线;探索了多层模板支撑体系传力路径和荷载传递规律。进一步用有限元分析软件SAP2000建立了多层模板支撑体系施工期性能分析模型,将数值分析结果与实测结果进行对比,并分析了产生差异的原因,实现了对多层模板支撑体系施工期的模拟。In this paper,the axial force of vertical bars and relative displacement of floor in a frame shear wall structure are measured on site during construction. Then the time history for construction's internal force curve and relative displacement are obtained. Thus,the path of force transfer and load transfer law in multistory formwork supports system is studied. Furthermore,the finite element software SAP2000 is adopted to develop the performance analysis model of multistory formwork support system in construction.The difference between the value of analysis model and on-site is compared and possible reason is presented in this paper,which realize the simulation of multistory formwork supports system.
分 类 号:TU731.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.52.76