New progress on beam availability and reliability of PKU high intensity CW proton ECR ion source  被引量:1

New progress on beam availability and reliability of PKU high intensity CW proton ECR ion source

在线阅读下载全文

作  者:Shi-Xiang Peng Ai-Lin Zhang Hai-Tao Ren Yuan Xu Tao Zhang Jing-Feng Zhang Jia-Mei Wen Zhi-Yu Guo Jia-Er Chen 彭士香;张艾霖;任海涛;徐源;张滔;张景丰;温佳美;郭之虞;陈佳洱(SKLNPT& IHIP, School of Physics, Peking University, Beijing 100871, China University of Chinese Academy of Sciences, Beijing 100049, China)

机构地区:[1]SKLNPT & IHIP, School of Physics, Peking University, Beijing 100871, China [2]University of Chinese Academy of Sciences, Beijing 100049, China

出  处:《Chinese Physics B》2017年第2期345-348,共4页中国物理B(英文版)

基  金:Project supported by the National Basic Research Program of China(Grant No.2014CB845502);the National Natural Science Foundation of China(Grant No.11575013)

摘  要:The stability and reliability of an ion source and its beam availability are extremely significant for any accelerator,especially for those high current long term CW operation ones like ADS. Although the first high quality 306-hours continuous wave(CW) operating curve at 50 m A@35 ke V has been successfully obtained with a standard compact 2.45 GHz ECR ion source at Peking University(PKU), but the uncertainties that caused beam trips before are unacceptable during an accelerator real operation and should be eliminated. Meanwhile, no permission will be given when the beam power is upgraded from 50 m A@35 ke V to 50 m A@50 ke V. To improve the PKU CW proton source quality, several upgrades were done recently. After those improvements, a new long term CW proton beam experiment at 50 m A@50 ke V was carried out in June 2016. The total running time is 300.5 hours, including near 6 hours ion source preparation and 294 hours non-disturb continuous operation. Within the continuous 13 days operation, no beam-off happened, no spark was observed,no beam drop appeared, no interrupting action was needed, and only a few beam fluctuations caused by the air conditional failure occurred. Beam availability and reliability within the 294 hours is 100%. The root-mean-square(RMS) emittance of this 50 m A@50 ke V CW proton beam is about 0.186 π.mm.mrad. A careful inspection of the ion source was done after this long term operation and no obvious damage was found. The restart experimental results obtained after the ion source inspection prove the high repeatability of PKU PMECRIS. In addition, a 130-m A H+beam was obtained at 50 k V with duty factor of 10%(100 Hz/1 ms) with this source. Details will be presented in this paper.The stability and reliability of an ion source and its beam availability are extremely significant for any accelerator,especially for those high current long term CW operation ones like ADS. Although the first high quality 306-hours continuous wave(CW) operating curve at 50 m A@35 ke V has been successfully obtained with a standard compact 2.45 GHz ECR ion source at Peking University(PKU), but the uncertainties that caused beam trips before are unacceptable during an accelerator real operation and should be eliminated. Meanwhile, no permission will be given when the beam power is upgraded from 50 m A@35 ke V to 50 m A@50 ke V. To improve the PKU CW proton source quality, several upgrades were done recently. After those improvements, a new long term CW proton beam experiment at 50 m A@50 ke V was carried out in June 2016. The total running time is 300.5 hours, including near 6 hours ion source preparation and 294 hours non-disturb continuous operation. Within the continuous 13 days operation, no beam-off happened, no spark was observed,no beam drop appeared, no interrupting action was needed, and only a few beam fluctuations caused by the air conditional failure occurred. Beam availability and reliability within the 294 hours is 100%. The root-mean-square(RMS) emittance of this 50 m A@50 ke V CW proton beam is about 0.186 π.mm.mrad. A careful inspection of the ion source was done after this long term operation and no obvious damage was found. The restart experimental results obtained after the ion source inspection prove the high repeatability of PKU PMECRIS. In addition, a 130-m A H+beam was obtained at 50 k V with duty factor of 10%(100 Hz/1 ms) with this source. Details will be presented in this paper.

关 键 词:PKU PMECRIS 50mA@50keV CW proton beam 300-hours continuous operation no beam-off 

分 类 号:O572.211[理学—粒子物理与原子核物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象