高速铁路牵引变电所三变压器接线方案研究  被引量:1

Study on Wiring Scheme for 3 Transformers in Traction Substation for High Speed Railway

在线阅读下载全文

作  者:尹磊[1] 陈纪纲[1] 

机构地区:[1]中铁二院工程集团有限责任公司

出  处:《电气化铁道》2017年第1期1-4,共4页Electric Railway

摘  要:研究了高速铁路牵引变电所采用3台牵引变压器的方案。分析了三变压器方案中牵引变电所的主接线和运行方式,对比了牵引变电所设置3台变压器的方案与目前高速铁路应用的四变压器方案。研究结论认为牵引变电所采用3台变压器的方案在我国高速铁路牵引供电系统是可行的,提出了三变压器方案应用时在设计和运营中需要注意的事项。In this paper,study has been made on scheme for wiring of 3 traction transformers in traction substation for high speed railway.Analysis has been made for main wiring and operation modes of the scheme for 3 transformers in traction substation,comparison has been made between schemes for traction substations setting with 3 sets of transformers and setting with 4 transformers.The conclusion of the researches shows that the scheme with setting of 3 sets of transformers is feasible for traction power supply system for high speed railway in our country,and precautions for design and operation of the scheme setting with 3 transformers are put forward accordingly.

关 键 词:牵引变电所 变压器 接线 

分 类 号:U224.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象