检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘绪为[1] 徐洁[1] 林蔓[1] 李彤[1] 张英旭[1] 张雷[1] 于中海[1] LIU Xu-wei XU Jie LIN Man LI Tong ZHANG Ying-xu YU Zhong-hai ZHANG Lei(North China Municipal Engineering Design and Research Institute Co. Ltd., Tianfin 300381, China)
机构地区:[1]中国市政工程华北设计研究总院有限公司,天津300381
出 处:《中国给水排水》2017年第4期48-50,共3页China Water & Wastewater
摘 要:正定新区全地下污水处理厂工程采用了MBR工艺,详细介绍了其工艺设计、平面与竖向设计、结构设计、消防设计、除臭设计、投资及运行成本。该工程用地指标仅为0.42 m^2/m^3,出水指标全部稳定达标。其设计经验可供其他类似工程参考。The MBR process was adopted in the underground sewage treatment plant in Zhengding New District. The process design, horizontal and vertical design, structural design, fire safety design, deodorization design as well as investment and running cost were discussed. The land index of the project was only 0.42 m^2/m^3. All the effluent indexes could meet the discharge standards. The design experi- ence can provide reference for similar projects.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15