机构地区:[1]中国石油浙江油田公司 [2]中国石油杭州地质研究院
出 处:《中国石油勘探》2017年第1期29-37,共9页China Petroleum Exploration
基 金:国家科技重大专项"云南昭通页岩气开采试验"(2012ZX0518-006);中国石油天然气集团公司重大专项"昭通示范区页岩气钻采工程现场试验"(2012F-47-02)
摘 要:与已成功开发页岩气的北美地区及四川盆地内勘探开发区块不同,昭通国家级页岩气示范区地质条件复杂、山地地形地貌、钻采工程实施难度大、作业成本高、安全环保管理要求高、页岩气开发风险大。通过"一体化技术手段保质量、促产量,创新管理模式提效率、要效益"的开发思路,探索了适用于南方海相山地页岩气条件的产建一体化IPDP(Integrated Project Development by Production)高效开发模式。IPDP模式以勘探与开发、地质与工程、科研与生产一体化为基础,以一体化项目运作IPMP(Integrated Project Management by Production)模式和地质与工程技术支撑团队为保障,采用"效益产量为目标导向、工程技术保障、逆向思维设计、正向组织实施、工厂化作业"的工作机制,全方位推行全生命周期一体化项目组织实施做法,从而实现由研究评价、现场生产实施到项目组织管理全过程把控的山地页岩气钻采工程品质和气井产量。通过采用与单井产气量挂钩的一体化风险项目总包模式,增强效益产量责任意识,优化生产组织,确保各环节无缝衔接,有效提高作业效率,实现降本增效,规避了开发风险,实施效果显著,为南方海相山地页岩气高效开发作出了有益探索。The Zhaotong National Shale Gas Demonstration Zone is different from the explored and developed blocks in North America and the Sichuan Basin where shale gas has been successfully developed. It is characterized by complex geology, mountainous landform, high difficulty in drilling and production engineering, high operation cost, high-level safety and environment management and high risks in shale gas development. According to the development concept of "ensuring the quality and promoting the production by integrated technologies, and increasing the efficiency and improving the benefit by innovative management model", the IPDP(Integrated Project Development by Production) high-efficiency development model which is suitable for the marine mountain shale gas in South China was proposed. The IPDP model is based on exploration-development integration, geology-engineering integration and research-production integration, and it is technically supported by the IPMP(Integrated Project Management by Production) model and geology engineering teams. In this model, the life-cycle integrated project organization and implementation is carried out according to the working mechanism of "beneficial production as the target, engineering technology as the support, reverse thinking based design, positive organization and implementation, and factory-like operation". In this way, the drilling and production engineering quality and well production rate of mountain shale gas are controlled all through the process from the aspects of research and evaluation, field production and implementation, and project organization and management. By virtue of the turnkey model of integrated risk project which is linked to individual-well gas production rate, the sense of responsibility for beneficial production is enhanced and the production organization is optimized, so that each link is seamlessly connected, operation efficiency is effectively increased, the cost is decreased, the benefit is increased, the development risk is avoided
关 键 词:山地页岩气 地质工程一体化 一体化 工厂化 IPDP IPMP 黄金坝 昭通
分 类 号:TE313[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...