某铜矿采场底部结构技术改造  被引量:1

Technical Optimization of Bottom Structure of a Copper Mine

在线阅读下载全文

作  者:王凤麟[1] 张耀平[1,2] 

机构地区:[1]江西理工大学资源与环境工程学院,江西赣州市341000 [2]江西理工大学应用科学学院,江西赣州市341000

出  处:《矿业研究与开发》2017年第2期31-34,共4页Mining Research and Development

摘  要:针对矿山传统底部结构存在的作业安全风险性大、出矿卡漏现象严重等问题,进行了"V"型堑沟改造试验。试验结果表明,"V"型堑沟受矿可明显提高矿山生产作业的安全性和出矿效率,采场生产能力由160t/d提高到210t/d,明显增加矿山经济效益。There are some problems of traditional bottom non of ore drawing leakage and so on. In view of these structure in a mine, such as poor working security, serious phenomeproblems, the experimental researches on the transformation of V- shaped trench were carried out. The optimization results showed that working security and mining efficiency of V-shaped trench were improved obviously. Meanwhile, the stope production could reach to 210 tons per day, which had significant meaning to improve economic efficiency.

关 键 词:分段空场采矿法 底部结构 “V”型堑沟 采场生产能力 

分 类 号:TD853.32[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象