计及风电概率分布特征的鲁棒实时调度方法  被引量:40

Robust Real-time Dispatch Considering Probabilistic Distribution of Wind Generation

在线阅读下载全文

作  者:于丹文 杨明[1] 韩学山[1] 马世英[2] 刘道伟[2] 

机构地区:[1]电网智能化调度与控制教育部重点实验室(山东大学),山东省济南市250061 [2]中国电力科学研究院,北京市海淀区100192

出  处:《中国电机工程学报》2017年第3期727-737,共11页Proceedings of the CSEE

基  金:国家自然科学基金项目(51007047);国家重点基础研究发展计划(973计划)(2013CB228205);国家电网公司科技项目(XT71-15-056)~~

摘  要:风力发电与常规电源相比具有不可控性,大规模的风电并网将使电力系统运行中的不确定性进一步增强,加重电力系统备用负担。同时,含风电的有功调度问题在运用不确定性优化方式进行处理时,算法实用性与结果最优性之间存在矛盾。针对上述问题,该文提出了一种计及风电功率概率分布特征的鲁棒实时调度方法,依据系统运行成本与风电接纳条件风险价值(conditional value-at-risk,CVa R)双重指标,按照鲁棒优化的建模思路构建优化模型,对各自动发电控制机组的运行基点及备用容量进行决策,获得具有统计意义的节点可接纳风电功率的范围。方法体现了鲁棒优化和随机规划方法的融合,调度结果具有概率优性,能有效提高电网运行效益且计算效率较高。通过对简单6节点系统及IEEE 118节点系统的计算与分析验证了文中方法的有效性。Compared with conventional power, wind power is not controllable. Large-scale wind power integration will further increase the uncertainty and the requirement of reserve in the operation of the electric power system. Meanwhile,when the active power dispatch problem including wind power solved by the uncertainty optimization method, it may face the contradictions between the practicality of the algorithm and the optimality of the results. In view of the above problems, this paper proposed a robust real-time dispatch method which considered probability distribution characteristics of wind power. Based on both the index of the total operating cost of power system and the total conditional value-at-risk(CVa R) cost of wind power, the optimization model was constructed according to the theory of robust optimization. The operating point and the reserve capacity of each automatic generation control(AGC) unit were decided to obtain the range of wind power accepted by each node with statistical significance. The method embodies the combination of the robust optimization method and the stochastic programming method, and its results show the optimal probability, which can improve the efficiency of power system and the computing efficiency. The validity of the proposed method was verified by the calculation and analysis of a simple 6-bus system and the IEEE 118-bus system.

关 键 词:风力发电 实时调度 鲁棒优化 风险评估 自动发电控制 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象