检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东粤电新会发电有限公司,广东江门529149
出 处:《湖北电力》2016年第8期27-29,共3页Hubei Electric Power
摘 要:以建设期内的燃气-蒸汽联合循环热电联产机组为对象,分析了机组汽轮机凝汽器在启动和运行阶段的工作状态区别,以及两种状态对真空泵要求的区别。分别计算了两种状态下凝汽器真空泵所需要的抽汽量,结果表明根据机组启动工况设计真空泵很难同时满足机组运行状态时真空泵高效节能运转。与成熟燃机电厂的改型方案进行比较,计算结果和实际情况吻合,说明此种改型方案可行且值得推广。Based on the gas-steam combined cycle units in construction period, the differences between the start-up and the operating state of steam turbine condenser are analysised, as well as the different requirements of the vacuum pump in these two states. The extraction steam of vacuum pump in these two states are calculated. It is concluded that the vacuum pump is hard to meet the running status with high efficiency and energy saving, when the pump design based on the unit start-up operating. The conclusion is compared to the retrofit scheme of a mature generation station, turning out to be good matches, which means such kind of retrofit scheme is feasible and worthy to be popularized.
关 键 词:燃气-蒸汽联合循环 凝汽器 真空泵 启动 运行效率
分 类 号:TM621.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249