对增建二线站改信号施工方案的探讨  被引量:2

Discuss on Signal Reconstruction Plan of Stations For Adding Second Track

在线阅读下载全文

作  者:刘明和 

机构地区:[1]成昆铁路有限责任公司

出  处:《铁道通信信号》2017年第2期37-39,共3页Railway Signalling & Communication

摘  要:因为铁路既有线站改工作量巨大,在施工过程中要尽可能减小对运输的干扰,所以不可能一次到位;又由于信号施工在站改工程中与行车安全密切相关,且各专业均存在交叉制约影响,因此,结合成昆铁路成峨段扩能改造工程站改情况,对既有线增建二线站改信号施工方案编制工作进行了探讨。Because of heavy workload of reconstruction of a station on existing railway line and the requirement of minimizing the interferences on transportation,it is impossible to complete the reconstruction once for all.Otherwise,the construction of signal is in close relation to traffic safety during of the period of station reconstruction and has cross restrictions on the engineering of every specialty.Therefore,combine with the case of reconstruction of stations in ChengduEmei section of Chengkun railway for capacity expanding,how to prepare the signal reconstruction plan for adding the second track to the existing railway line is explored.

关 键 词:站改 信号施工 方案编制 

分 类 号:U282.3[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象