检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邹祖冰[1]
机构地区:[1]中国长江三峡集团公司机电工程局,四川成都610040
出 处:《水电与新能源》2017年第2期17-19,共3页Hydropower and New Energy
摘 要:向家坝电站单机额定功率800MW是世界上最大的水轮发电机组,设计、生产者根据分析选定额定电压23kV,也是水轮发电机最高的电压等级,目前尚没有其绝缘系统及定子线棒设计制造和运行经验,属于全新开发设计。根据对定子线棒结构设计的论证和发电机定子线棒相关的各项试验等验证,23kV发电机出口电压选择是合理的。The 800 MW hydro-turbine generator unit in Xiangjiaba Hydropower Station is the largest hydro-turbine generator unit in the world. The rated output voltage designed by Tianjin Alstom Company is 23 kV,which is also the highest. The design,manufacture and operation of the stator bar and the insulation system are new and challenging topics,in which no experience is available. With the analysis of the structural design of the stator bar and relevant tests,the stator bar insulation and the designed output voltage are proved to be appropriate.
分 类 号:TM621.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222