昆明枢纽扩能改造昆明站岔改信号过渡方案研究  被引量:3

Signal Transition Engineering Design Scheme for Reconstruction of Kunming Junction

在线阅读下载全文

作  者:钱怀武[1] 

机构地区:[1]中铁二院昆明勘察设计研究院有限责任公司,昆明650200

出  处:《铁路通信信号工程技术》2017年第1期84-87,共4页Railway Signalling & Communication Engineering

摘  要:在既有线运输作业十分繁忙的车站进行施工,为解决行车作业对施工的影响及运输与岔改倒接的矛盾,分析制定合理、行之有效的信号过渡设计方案,保证施工行车两不误,确保信号设备安全、顺利、正点开通。为既有线施工、设计提供参考。When a busy existing line is under construction, it needs to solve the traffic operation influence on construction and the contradiction between turnout installation and old signal system replacement with transportation, this paper presents the design of a reasonable and effective signal transition program to ensure normal implementation of both construction and transportation, in order to put signal equipment into service safely, smoothly and punctually, and it provides reference for construction and design of existing lines.

关 键 词:施工 岔改 信号过渡工程设计 

分 类 号:U28[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象