检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈悦祥[1]
机构地区:[1]大庆油田有限责任公司试油试采分公司,黑龙江大庆163412
出 处:《油气井测试》2017年第1期73-74,共2页Well Testing
摘 要:蒸汽驱现场试验时间延长、地层注汽压力增高,导致蒸汽驱蒸汽干度降低,严重影响蒸汽驱的现场试验地质效果。从试驱、井区、地层以及地质特点入手,分析了导致蒸汽驱压力增高的几个影响因素,包括地层泥质含量、储层性质、注汽时间等,并对此提出对地层预处理、注汽前补射孔、试挤、解堵等整改措施。经现场应用,降低了注汽压力,取得了较好地质效果,对大庆其它热采技术开发稀油区块具有较好的指导作用。That of field test time for the steam injection is long,steam injection pressure to formation is big,results in steam drive dryness decreased,seriously affecting the field test geological effect of steam drive. Starting from the geological features of the test wells,several factors leading to increased pressure of steam flooding are analyzed,mainly being shale content,reservoir properties,steam injection time etc,withal the rectification measures of pretreatment to the formation,steam injection supplement before perforation,and trying to squeeze,blocking are put forward. By field application,the pressure of steam injection is reduced,and good geological effect is achieved,which has a good guiding role for the development of thin oil block by other thermal technology in Daqing oilfield.
分 类 号:TE357[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200