塔机双缸动作不同步现象仿真分析及系统改进  被引量:1

Simulation Analysis and System Improvement for Double Cylinder Nonsynchronous Motion of Tower Crane

在线阅读下载全文

作  者:费烨[1,2] 李鹏程[1,2] 王春琢[3] 

机构地区:[1]沈阳建筑大学机械工程学院,辽宁沈阳110168 [2]沈阳建筑大学高档石材数控加工装备与技术国家地方联合工程实验室,辽宁沈阳110168 [3]中国建筑科学研究院建筑机械化研究分院,河北廊坊065000

出  处:《机床与液压》2017年第4期76-78,101,共4页Machine Tool & Hydraulics

摘  要:大型自升塔式起重机采用液压双缸顶升降节,两液压缸运动的同步性对安全施工有重要影响。为此,借助AMESim对某塔机原双缸顶升系统建模仿真,发现其降节不同步原因在于将法国POTAIN塔机单缸顶升简单倍加用于国产双缸系统,据此对原系统进行改进。仿真结果表明,改进后的系统可以实现双缸顶升塔机降节操作的同步性要求。In heavy self-elevating tower crane, hydraulic double-cylinder lifting and dropping is adopted, it' s very important for the safe construction to ensure two cylinders synchronous motion. For this reason, the simulation of original double cylinder lifting hydraulic system for a tower crane was made with the help of AMESim. The cause of nonsynchronous motion was the single-cylinder lifting of French POTAIN tower crane was used double in the domestic two cylinder systems. Hereby, the original system was improved. Simulation results show the new system can implement double cylinder synchronization requirements in the drop tower operation.

关 键 词:塔式起重机 双缸同步性 仿真分析 系统改进 

分 类 号:TH137[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象