复杂条件下深基坑沉箱止水井点降水施工技术  被引量:9

CAISSON WATER-STOP AND WELL POINT DEWATERING CONSTRUCTION TECHNIQUE IN DEEP FOUNDATION PIT UNDER COMPLEX CONDITIONS

在线阅读下载全文

作  者:马南湘[1] 马骏[1] 

机构地区:[1]广西建设职业技术学院,南宁530000

出  处:《建筑技术》2017年第3期243-244,共2页Architecture Technology

基  金:广西高校科研一般项目资助<校企建筑业工法和QC开发建设与转化应用研究>(YB2014520)

摘  要:南宁万汇华府基坑施工中,针对多层地下水及防空洞的复杂条件,同步采用井点降水+钢板,局部辅助堵漏的施工方法,在短期内满足混凝土浇筑要求,节省了工期,保证了质量,并降低成本74 940元,该做法已获批广西自治区级工法,社会效益良好。Considering the complex conditions of multi-layer groundwater and air-raid shelter during foundation pit construction of Nanning Wanhui Mansion project, well point dewatering technique and steel plate were synchronously used and auxiliary local blocking method was adopted to satisfy the short-term concrete pouring requirements, shorten the construction schedule and guarantee construction quality. RMB 74?940 construction cost was saved. This construction process has been granted as the municipal construction method of Guangxi Zhuang Autonomous Region, realizing favorable social benefits.

关 键 词:深基坑 沉箱止水 井点降水 

分 类 号:TU753.66[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象