检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吉林省水利水电勘测设计研究院,吉林长春130021
出 处:《吉林水利》2017年第3期8-11,共4页Jilin Water Resources
摘 要:云南万家口子水电站工程高压引水隧洞最大静水头154.55m,洞身走线中间处有一断层出露。隧洞开挖过程中,在外水压力作用下,洞室围岩存在涌水和渗透破坏,部分洞段小断层及岩溶发育。针对不同围岩段和衬砌方式,合理选择灌浆工艺、灌浆参数,有效提高围岩抗劈裂强度和防渗性能,解决地质缺陷问题。High pressure headrace tunnel of Wanjiakouzi Hydropower Station in Yunnan,which maximum stat- ic head is 154.55m,and at the center of the hole body go line where is a fault exposed.In the process of tunnel excavation which in the external water pressure,presence of water gushing and surrounding rock permeability damage,in some areas, small faults and karsts development.According to different surrounding rock and lining, choose the grouting process and grouting parameters, so as to improve the splitting strength and anti-seepage performance of the surrounding rock effectively, and solve the problem of geological defects.
分 类 号:TV732.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28