检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱张峰[1] 郭正兴[2] 朱寅[2] 李亚坤[2] ZHU Zhangfeng GUO Zhengxing ZHU Yin LI Yakun(College of Civil Engineering, Nanjing Tech University, Nanjing 211816, China School of Civil Engineering, Southeast University, Nanjing 210096, China)
机构地区:[1]南京工业大学土木工程学院,江苏南京211816 [2]东南大学土木工程学院,江苏南京210096
出 处:《湖南大学学报(自然科学版)》2017年第3期55-60,共6页Journal of Hunan University:Natural Sciences
基 金:"十二五"国家科技支撑计划项目(2011BAJ10B03)~~
摘 要:试验研究了2种不同连接构造的装配式混凝土剪力墙抗震性能,第一种为钢筋浆锚搭接干式连接节点,第二种则在第一种基础上进行构造变化,边缘构件局部现浇,墙肢中部仍然采用钢筋浆锚搭接连接,形成干、湿混合连接节点.分别制作1片干式连接节点、1片混合连接节点足尺试件进行低周反复荷载加载试验,并与同条件现浇试件进行对比.试验结果表明,在承载力、刚度、位移延性及耗能能力等方面,2种装配式试件均与现浇试件相当,其抗震能力可认为与现浇等同.同时,混合连接节点试件虽在耗能方面稍优于干式连接节点试件,但优势并不明显,且考虑到其施工工艺复杂,现浇混凝土浇筑质量较难得到保障,易对节点抗震性能产生明显不良影响,故不建议采用.Two different types of horizontal connections for precast concrete shear walls are proposed and tested to evaluate their seismic performance. One is dry connection with vertical reinforcing bars an- chored into the grout-filled metal bellows embedded in the precast wall, while the other is hybrid connection where the boundary elements are formed by locally placing concrete with vertical reinforcing bars lapping in the cast-in-place concrete, and the reinforcing bars placement is the same that of the dry connection. Three full-scale specimens of the dry connection, hybrid connection, and cast-in-place connection were prefabricated and tested under the low-cycle reverse loading. The measured results showed that both the precast specimens performed similarly, such as the strength, stiffness, displacement ductility, and energy dissipation capacity, and they possessed comparable seismic performance when compared with the cast-in-place specimen. Meanwhile, the seismic behavior of the hybrid connection was obviously dependent on the pouring quality of the locally placing concrete. Because of the complexity in the construction technology for the concrete placing of hybrid connection, it is difficult to ensure the quality, and the seismic performance is considerably weakened. Therefore, it is not recommended to apply the hybrid connection in precast concrete shear walls.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249