作 者:陈昌云[1] CHEN Chang-yun(China Nerin Engineering Company Limited ,Nanchang 330001,China)
机构地区:[1]中国瑞林工程技术有限公司,江西南昌330001
出 处:《建井技术》2016年第6期46-50,共5页Mine Construction Technology
摘 要:主溜井系统在矿山开拓系统中,占有重要地位。主溜井系统出现问题,将影响整个矿山生产系统的正常运转,甚至造成矿山停产。当溜井井壁破损、溜井坍塌而不能满足生产需求时,需要进行修复。对溜井破损原因作了分析,对几种典型破损情况修复方案作了介绍,最后介绍了1个典型工程修复案例,可为金属矿山溜井修复设计和施工提供借鉴。A mine main ore pass shaft system had an important position in the mine development system. A problem occurred in the mine main ore pass shaft system would influence the normal operation of the whole mine production system and even would cause the mine production stop. When the mine production requirements could not be met due to the shaft liner of the ore pass shaft damaged and the mine ore pass shaft collapsed, a repair operation should be conducted. An analysis was conducted on the damage causes of the mine ore pass shaft and an introduction was made on the several typical damage repair plans. Finally,a typical engineering repair case was introduced and could provide the references to the design and construction of the mine ore pass shaft repair in the metal mines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166