检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱洪波[1] 王勇[1] 李伟[1] ZHU Hongbo WANG Yong LI Wei(State Grid Liaoning Electric Power Co., Ltd., Shenyang, Liaoning 110006, China)
机构地区:[1]国网辽宁省电力有限公司,辽宁沈阳110006
出 处:《东北电力技术》2016年第11期19-21,24,共4页Northeast Electric Power Technology
摘 要:大连柔性直流输电工程受端换流站地处大连市区中心,站界噪声需要控制在Ⅰ类标准。换流站的噪声源主要来源于户外设备,根据总平面布置方案采用Soundplan软件对站区进行模拟仿真,计算换流站采用水冷和空冷2种方案的噪声,当不满足噪声要求时,采用降噪措施使之降至45 d B以下。该工程因故没有实施,但是前期研究结果具有一定意义,有必要共同探讨。Convertor station of Dalian voltage source converter based on HVDC transmission system is located in central urban of Zhongshan district.Converter station noise should be controlled within standard Ⅰ.Noise source comes from outdoor devices.According to the general layout plan,a simulation using Soundplan is done to simulate and calculate noise levels of water cooling and air cooling.After implementing counter-noise measures,noise level is reduced to below 45 decibels.Although this engineering project is not actually realized,it is believed that the simulation results help to make sense in the future.
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15