作 者:李科[1] 田春筝[1] 刘巍[2] 刘洪[3] 范博宇[3]
机构地区:[1]国网河南省电力公司经济技术研究院,郑州450000 [2]国网河南省电力公司,郑州450000 [3]天津大学智能电网教育部重点实验室,天津300072
出 处:《电力系统及其自动化学报》2017年第3期126-130,共5页Proceedings of the CSU-EPSA
摘 要:针对当前配电网规划只考虑单电压级的问题,提出了多电压级协调模型及过渡方案。首先,提出了多电压级协调程度的衡量指标,在此基础上,分析了变电站互联对多电压级协调程度的影响;然后,以三座站互联为例,构建供电模型,提出模型属性参数合理取值的计算方法;最后,构建了可尽量平滑过渡到远景年供电模型的过渡方案,为区域电网各个阶段的建设提供指导。Considering that current research only focuses on the single voltage in the planning of distribution grid, amulti-voltage coordinated model and its transition scheme are proposed. First, the measurement index of multi-voltagecoordination degree is formulated, and the effect of substation interconnection on the same degree is analyzed according-ly. Then, the interconnection of three substations is taken as an example to establish the power supply model, and thecalculation method of reasonable values for the parameters in the proposed model is given. Finally, the transitionscheme that can smoothly transit to the power supply model in the long-range years is established, which can provideguidance for the construction of regional grid in different stages.
分 类 号:TM711[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112