66kV直挂交换虚拟电路投切过电压仿真研究  

Simulation Research on 66 kV Vertical SVC Switching Overvoltage

在线阅读下载全文

作  者:徐博宇[1] 武俊杰[2] 赵普志 

机构地区:[1]国网辽宁省电力有限公司铁岭供电公司,辽宁铁岭112000 [2]国网新疆电力公司疆南供电公司,新疆喀什844000 [3]国网新疆电力有限公司,新疆乌鲁木齐830002

出  处:《山西电力》2017年第1期64-67,共4页Shanxi Electric Power

摘  要:66kV直挂型交换虚拟电路已经在很多变电站得到应用。针对近几年使用过程中多次发生了66kV直挂型交换虚拟电路相控电抗器树桩击穿故障,参照东鞍山220kV变电站的直挂66kV交换虚拟电路系统搭建模型,利用PSCAD仿真交换虚拟电路装置投切过程,研究分析出在某些工况下相控电抗器两端出现了较大的投切过电压,可加速相控电抗器匝间绝缘层的老化,是相控电抗器损坏的原因之一。66 kV vertical SVC has been already put into operation in several transformer substations. In view of tree discharge or breakdown failure frequently happening in the phase-controlled reactor in the 66 kV vertical SVC, PSCAD software is used to conduct a simulation research on 66 kV vertical SVC system installed on Donganshan 220 kV transformer substation. It is concluded that SVC switching overvohage might happen at both ends of phase-controlled reactor, which might accelerate insulation aging and damage of phase-controlled reactor.

关 键 词:66kV直挂交换虚拟电路 相控电抗器 避雷器 

分 类 号:TM72[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象