基于双手作业分析的灌装设备接线工序改善  

Improvement of Wiring Process for Filling Equipment Based on Two-handed Operation Analysis

在线阅读下载全文

作  者:吴盛洁 韩笑乐[1] 

机构地区:[1]同济大学机械与能源工程学院,上海201804

出  处:《机械制造》2017年第3期89-92,共4页Machinery

摘  要:针对A公司灌装设备生产线中总装环节存在的浪费问题,利用双手作业分析对接线工序进行了分析和改进,包括改变各步骤先后顺序、调整工装工具、明确工作前后的各项要求和改善工作环境等。通过对比显示,改善后工时缩短,操作人员的劳动强度降低,员工满意度得到了提高,效果良好。In order to solve the waste problem existing in the general assembly station of the filling equipment production line in A company,the two-banded operation analysis was used to analyze and improve the wiring process,including changes of the step order, tooling adjustment, definition of the requirements before/after the work and improve the work environment. Through the comparison it shows that the man-hour is cut, the labor intensity of the operator is reduced, employee satisfaction is improved and the effectiveness is good.

关 键 词:灌装生产线 双手作业 接线 改善 

分 类 号:TH162[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象