检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王朝辉[1] WANG Chaohui(The 5th Engineering Co. Ltd. of the 18th Bureau Group of China Railway,Tianjin 300456,China)
机构地区:[1]中铁十八局集团第五工程有限公司,天津300456
出 处:《国防交通工程与技术》2017年第2期74-77,共4页Traffic Engineering and Technology for National Defence
摘 要:对中央大道海河隧道工程沉管施工关键技术进行了分析研究,阐述了沉管接头抗震分析、管段预制及沉放、干坞稳定性分析以及护岸结构稳定性分析等关键技术,为我国北方地区、高震区修建类似工程积累经验。Upon the basis of analyzing and studying the key techniques for the construction of the immersed tubes for the Haihe River Tunnel Project under the Central Avenue of Tianjin, such key techniques for the project as the anti-seismic analysis of the joints of the immersed pipes,the pre-casting and sinking of the pipe segments, the stability analysis of the dry dock, as well as the stability analysis of the protective banks, are expounded in the paper. The paper helps accumulate experience for building similar projects in northern regions and high-seismic districts of our country.
分 类 号:U455.46[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.153